Its a start. When they originally announced it SEVEN years ago I was hoping that the entire Greenway would be completed by now!https://wearemodeshift.org/detroits-inner-circle-greenway-project-receives-needed-funding |
Originally Posted by detroitjim
(Post 21616799)
Its a start. When they originally announced it SEVEN years ago I was hoping that the entire Greenway would be completed by now!https://wearemodeshift.org/detroits-inner-circle-greenway-project-receives-needed-funding |
Virtual Public Meeting For the JLG SHARE YOUR VISION FOR THE GREENWAY
Joe Louis Greenway Design Public Meeting 2 Thursday, October 29th, 6-8pm Join Zoom Meeting https://zoom.us/join Meeting ID: 917 4519 1827 Call-in Phone Number 1(267)-831-0333 Meeting ID: 917 4519 1827 City of Detroit JLG website https://detroitmi.gov/departments/ge...louis-greenway JLG phase 1 Presentation https://detroitmi.gov/sites/detroitm...esentation.pdf They are “aiming to finish Phase I in Fiscal Year 2022.” |
Cleanup work set to begin on next phase of the Joe Louis Greenway on city’s west sideCleanup efforts are set to begin this month for a stretch of overgrown rail corridor once owned by Conrail and now owned by the city. Cleanup crews working into the cold months will better position construction crews that are scheduled to begin work in Spring 2021, said Jeff Klein, the city’s deputy chief of landscape architecture. It’s anticipated that the new pathways will be completed by the end of next year. https://www.modeldmedia.com/devnews/...cMeeting2.aspx |
|
I ride near there all the time. Watched Joe Louis get razed.
|
?
Originally Posted by Whitecoyote
(Post 21862824)
I ride near there all the time. Watched Joe Louis get razed.
https://detroitmi.gov/sites/detroitm...20Eng.pptx.pdf |
when i bike it to "The D" from Canton, the southern half of this is about what I ride. Some time I loop Belle Isle, and maybe stop at the Red Hook Cafe.
It'll be nice if they clean up the section of Jefferson through Del Ray - I get nervous through there even though I've had no problems. -- And the heavy truck drivers are super-cool about having folks on bikes around. This will be a nice loop when it's done. And the bridge! Can't wait until I need my passport to go into Windsor to the Italian neighborhood for an expresso. https://cimg1.ibsrv.net/gimg/bikefor...4f6221b763.jpg |
Joe Louis Greenway land dispute
At least it doesn't effect phase 1. Wonder where they got this from???"finish in late 2021" .
That would be incredible!!! Wonder if the new betting parlors will take any action on their anticipated completion estimate. My money is on the over. From Crains Detroit. The city expects to break ground in in May on the first phase of the greenway, pending state environmental approval, and finish in late 2021. Crews have already started clearing out a pathway for the first leg, a 2.8-mile chunk of the former rail line from Warren Avenue to Fullerton Avenue that intersects with Grand River Avenue near the Dearborn border. It doesn't include the disputed land. |
Joe Louis Greenway groundbreaking planned for mid-spring 2021, Detroit to release framework planDetroit Chief Parks Planner Meagan Elliott expects the city to break ground on the first phase of its non-motorized loop in late April or early May. City officials plan on releasing the framework plan for the JLG at a public ceremony during the groundbreaking.https://cimg4.ibsrv.net/gimg/bikefor...75ddf20915.jpg Complete article. https://www.modeldmedia.com/devnews/...framework.aspx |
Originally Posted by detroitjim
(Post 22003056)
Joe Louis Greenway groundbreaking planned for mid-spring 2021, Detroit to release framework planDetroit Chief Parks Planner Meagan Elliott expects the city to break ground on the first phase of its non-motorized loop in late April or early May. City officials plan on releasing the framework plan for the JLG at a public ceremony during the groundbreaking.Complete article. https://www.modeldmedia.com/devnews/...framework.aspx My last trek was to Belle Isle with a stop and Red Hook. Then I just took Grand Blvd all the way to Tireman, then over to Hines Dr. An efficient route, but not super-scenic. I did get a glimpse of the Packard Plant on that route though.... I just kept moving.... |
Originally Posted by mrv
(Post 22005771)
I get nervous with the Q-Line tracks on Woodward.
They were still constructing the line when I hit the pavement,they were obscured by concrete dust mud . Just like that commercial" I know there around here somewhere.....Found em." |
All times are GMT -6. The time now is 07:29 PM. |
Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.