View Single Post
Old 08-21-15, 12:13 PM
  #6  
cthenn
Senior Member
 
Join Date: Jan 2010
Location: Walnut Creek, CA
Posts: 2,669

Bikes: 2023 Canyon Aeoroad CF SL, 2015 Trek Emonda SLR, 2002 Litespeed Classic, 2005 Bianchi Pista, Some BikesDirect MTB I never ride.

Mentioned: 10 Post(s)
Tagged: 0 Thread(s)
Quoted: 649 Post(s)
Liked 139 Times in 90 Posts
Here's the info from the CCCo Board of Supervisors meeting agenda.



[TABLE="class: tableCollapsed, width: 1563"]
[TR="class: top"]
[TD="class: nowrap mediumText bold"]C. 2[/TD]
[TD="class: mediumText, colspan: 2"]ADOPT Resolution No. 2015/314 approving and authorizing the Public Works Director, or designee,to fully close a portion of Alhambra Valley Road,
near the intersection of Bear Creek Road, for a period not to exceed four (4) weeks, between August 25, 2015 and October 31, 2015
,
except for emergency traffic, for the purpose of constructing the Alhambra Valley Road Safety Improvements Project, Martinez area.
(26% Highway Safety Improvement Program Funds, 24% High Risk Rural Road Funds, 24% Proposition 1B, and 26% Local Road Funds)
[/TD]
[/TR]
[/TABLE]

VNA, you may be able to go past Pig Farm and drop down the west side but the closure will probably be just before the winery. It may actually be a nice out and back if there is less traffic. Although if some driver ignores the signs and gets turned around, there may be some road rage/speeding going on the way back! Closure is Bear Creek to just past the winery. You *should* be able to do AVR west to Bears loop no problem, just no going through AVR to Martinez.
cthenn is offline