View Single Post
Old 04-06-24, 01:29 PM
  #520  
seypat
Senior Member
 
Join Date: Oct 2010
Posts: 8,573
Mentioned: 69 Post(s)
Tagged: 0 Thread(s)
Quoted: 3261 Post(s)
Liked 2,582 Times in 1,535 Posts
Originally Posted by terrymorse
The "current system" is integrated bar & stem.

A "previous system" is separate bar & stem.

The difference in cost between this "current system" and the "previous system" is minimal, as demonstrated.

Therefore, your claim that there is a 10-15 times difference between "current system" (integrated bar & stem) and "previous systems" (separate bar & stem) is disproven.
But it's not between the first 2 piece adjustable system which was/must be included in the equation according to the time frame established. You can't leave that out at your convenience.
seypat is offline