View Single Post
Old 07-05-18, 07:40 AM
  #23  
Saul KK
Member
 
Join Date: Jun 2018
Location: Melbourne
Posts: 49
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 5 Post(s)
Likes: 0
Liked 11 Times in 7 Posts


Found some steel pipe that fits pretty well into the BB, squared off the end, and welded it to a plate. Then drilled and countersunk some holes so that I can screw it down to the MDF. I had planned to reference the BB off one of it's faces, but found that they are not parralel to each other.


Roughly shimmed everything up to have a look. Found some pipe that fits nicely into the HT, and figured a wider reference area would mean more accuracy in keeping the HT in line with the ST.

​​​​​​
Saul KK is offline