Originally Posted by
AvnerBen
The formal forecast was 100 pieces a month to start with, reaching 250 in spring. By this rate, my August delivery estimate was realistic. If we are down to two-digit month rate, then it's 2020.
I sincerely hope this is a temporary setback!
Again, I remember the projected logistics. The fact the bike is even rolling out at a possible double production rate should actually be applauded at this point. So far the Helix appears to be worth the wait. Soon those triple digits will be reached, you'll receive a bike, and the forums will be ablaze with praise for this beast. I'm welcoming the change,...I'm sooooo tired of all the dang Brompton threads! LoL!!!