Old 01-01-19, 07:50 PM
  #38  
shotwellian
Senior Member
 
Join Date: Jun 2014
Posts: 142
Mentioned: 3 Post(s)
Tagged: 0 Thread(s)
Quoted: 35 Post(s)
Liked 8 Times in 5 Posts
Originally Posted by Leinster
Open in 2 years? Great to see the optimism, but if they break ground in 2 years, that's be unbelievably fast. The Napa vine trail has hit so many obstacles, and If they consider it part of the route, it'll be a long coming.
Sigh. This article is garbage. The (anonymous? bot?) author has simply pulled the "2 years" figure out of thin air. I researched my own article on this for several months and interviewed a number of folks involved. No one involved has ever suggested that any piece of the trail would even be under construction by 2020, let alone that the entire trail would be done by then.
shotwellian is offline