Originally Posted by
MinnMan
We each have our anecdotes - they are a little different- and neither is sufficient to make generalizations. As for shipping in my case, it was the leg from China to S. F. that took longer than expected.
It was a little more than a month between when I placed and paid for the order and when I had the wheels in my hands.
It was a month for me as well, but the shipping was about what LB said it would be. The fabrication process took about a week longer than they projected.