Old 02-10-20, 07:16 AM
  #17  
JaccoW
Overdoing projects
 
JaccoW's Avatar
 
Join Date: Oct 2011
Location: Rotterdam, former republic of the Netherlands
Posts: 2,397

Bikes: Batavus Randonneur GL, Gazelle Orange Excellent, Gazelle Super Licht, Gazelle Grand Tourist, Gazelle Lausanne, Gazelle Tandem, Koga-Miyata SilverAce, Koga-Miyata WorldTraveller

Mentioned: 58 Post(s)
Tagged: 0 Thread(s)
Quoted: 784 Post(s)
Liked 1,238 Times in 686 Posts
I have 3 km (1.86 miles) from home to the train station.
All of it is separated bike paths with two roundabouts where I have the right of way, two traffic lights and a crossing to the underground bicycle parking.

All in all it's quite alright though some cycle paths are quite narrow at times which is mostly a problem in the morning rush hour.
JaccoW is offline