Originally Posted by
Ogsarg
New tube on the road. Patch it when I get home, check it for leaks by submersing, and it goes back in the seat pack for the next flat. I do carry a small patch kit in the event I get multiple flats but so far that hasn't happened.
Same here. So it's 5-10 minutes on the road, upwards of 30 min at home. I always let the rubber cemment to dry for good 10-15 minutes before applying the patch. In the meantime I tinker with something else on the bike.