View Single Post
Old 01-26-21, 01:10 PM
  #12  
guy153
Senior Member
 
Join Date: Dec 2019
Posts: 956
Mentioned: 3 Post(s)
Tagged: 0 Thread(s)
Quoted: 321 Post(s)
Liked 263 Times in 212 Posts
Originally Posted by Gyro_T
I will plan on some extra tacking this frame before I take it out of the jig. I will report back in a couple months.
I go with two tacks at the DT to HT, two at TT to HT and two at TT to ST. The BB shell is already fully welded to the ST at this point for me and the CS are also already fully attached. I don't need the jig to do the SS. Just sort of balance them there and sometimes use a bit of masking tape.

Then I take it out very carefully and add a couple more tacks to each junction on the welding table before going any further.
guy153 is online now  
Likes For guy153: