I rode by the switchback on Saturday morning. The ramp itself looks finished. However, the area around the bottom entry point still needs work and the existing railing at the top is still uncut. At the pace work is going, I expect it to be completed just in time for winter.


The width of the switchback is about 10'.



I expected it to be worse at the bottom of the ramp after the flooding a couple weeks ago... I think I read somewhere the issue with getting it open is access to the Point from the other end of the wharf but I don't follow it enough to know for sure as I tend to stay off the Smithfield St bridge.