As soon as the weather passes, but, here it is...Built up and rideable...I used the Jagwire Elite Link cable for shifting under the bar tape...With the indexing, it is smooth as butter, expensive, but I didn't want issue with kinking due to shallower drop bars. The pedals are Crank Bros, wide and light. But anyway, at least its built up and 98% done. Fenders and wire the light up next.
I think with the red bar tape, I shall call it Kemo-Sahbee, aka the Lone Ranger, haha!