Go Back  Bike Forums > Community Connections > Regional Discussions > Great Lakes
Reload this Page >

Detroit: Riverwalk east to open in October

Search
Notices
Great Lakes Illinois | Indiana | Iowa | Michigan | Minnesota | Ohio | Wisconsin

Detroit: Riverwalk east to open in October

Thread Tools
 
Search this Thread
 
Old 08-14-23, 09:00 AM
  #1  
detroitjim
Full Member
Thread Starter
 
detroitjim's Avatar
 
Join Date: Oct 2004
Posts: 365
Mentioned: 2 Post(s)
Tagged: 0 Thread(s)
Quoted: 71 Post(s)
Liked 65 Times in 48 Posts
Detroit: Riverwalk east to open in October

Took them long enough! Over six years .

Mt Elliot Park to Gabriel Richard Park approximately 2300 feet.


Detroiters this fall will reclaim a 2-mile strip of industrial ruin after 20 years of hope and $11 million of gritty work.

The Detroit Riverfront Conservancy expects in October to open what it calls the Uniroyal Promenade, an extension of the riverfront path from Mount Elliott Park to the MacArthur Bridge, enabling trail users to reach Belle Isle without dealing with traffic and noise on Jefferson Avenue.

The last stretch of concrete was poured last week on the trail that will connect the downtown riverfront to Belle Isle, 3.5 miles from the former Joe Louis Arena site to Gabriel Richard Park at the northeastern foot of MacArthur Bridge.
When the new segment of trail opens, the east RiverWalk will be complete, but the conservancy's mission when it was founded in 2003 was a 5.5-mile trail from MacArthur Bridge to Ambassador Bridge. That is projected to happen next year, Wallace said, with opening of the Ralph C. Wilson, Jr. Centennial Park west of the residential Riverfront Towers.

The western end of the path will stretch to Riverside Park, at the terminus of West Grand Boulevard, near the Ambassador Bridge. Wallace praised the city's renovation of Riverside Park, saying it has become one of the summer's most popular destinations. The city in 2020 completed environmental cleanup and a renovated picnic area, boat launch, parking, horseshoe and table tennis area.

The completed RiverWalk will avoid streets altogether, Wallace said, except for a stretch of less than half a mile, which will remain along East Atwater Street, bordering the Aretha Franklin Amphitheater and Robert C. Valade Park, which opened in 2019.




Article:
https://www.freep.com/story/news/loc...g/70559414007/
detroitjim is offline  
Likes For detroitjim:
Old 09-22-23, 04:09 PM
  #2  
detroitjim
Full Member
Thread Starter
 
detroitjim's Avatar
 
Join Date: Oct 2004
Posts: 365
Mentioned: 2 Post(s)
Tagged: 0 Thread(s)
Quoted: 71 Post(s)
Liked 65 Times in 48 Posts
Grand Opening of the Uniroyal Promenade
Saturday, October 21
10 a.m. to 2 p.m.
Mt. Elliott Park
110 Mt. Elliott Street
10 a.m.
Brief Remarks and Ribbon Cutting
10:30 a.m.
Stroll Across the New Promenade & Community Celebration
detroitjim is offline  
Old 09-23-23, 04:10 PM
  #3  
Troul 
Senior Member
 
Troul's Avatar
 
Join Date: Oct 2013
Location: Mich
Posts: 7,409

Bikes: RSO E-tire dropper fixie brifter

Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 6 Post(s)
Liked 2,982 Times in 1,921 Posts
the two miles is this area I take it?
__________________
-Oh Hey!
Troul is offline  
Old 10-20-23, 06:27 AM
  #4  
detroitjim
Full Member
Thread Starter
 
detroitjim's Avatar
 
Join Date: Oct 2004
Posts: 365
Mentioned: 2 Post(s)
Tagged: 0 Thread(s)
Quoted: 71 Post(s)
Liked 65 Times in 48 Posts
Tomorrow!!!!
detroitjim is offline  

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service -

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.