Go Back  Bike Forums > Community Connections > Regional Discussions > Southeast
Reload this Page >

Silver Comet Trail extension toward Atlanta expected to be announced within a week

Search
Notices
Southeast Alabama | Arkansas | Florida | Georgia | Kentucky | Louisiana | Mississippi | North Carolina | South Carolina | Tennessee | Virginia

Silver Comet Trail extension toward Atlanta expected to be announced within a week

Thread Tools
 
Search this Thread
 
Old 07-29-18, 07:31 PM
  #1  
larryfeltonj
Senior Member
Thread Starter
 
Join Date: Jun 2007
Location: Atlanta GA
Posts: 553

Bikes: Raleigh Supercourse, Peugeot Iseran, Raleigh Twenty

Mentioned: 1 Post(s)
Tagged: 0 Thread(s)
Quoted: 3 Post(s)
Likes: 0
Liked 1 Time in 1 Post
Silver Comet Trail extension toward Atlanta expected to be announced within a week

After Connect the Comet worked on this for over ten years, the announcement that the Silver Comet Trail is being extended toward Atlanta is expected within a week. At the moment, it looks like the first phase is building along the CSX tracks from the existing endpoint near the Publix on South Cobb Drive to the western edge of Plant Atkinson. Then the trick will be getting from there to the river. But this is a huge step forward.

https://cobbcountycourier.com/2018/0...ail-extension/
larryfeltonj is offline  
Old 07-29-18, 08:13 PM
  #2  
DrIsotope
Non omnino gravis
 
DrIsotope's Avatar
 
Join Date: Feb 2015
Location: SoCal, USA!
Posts: 8,553

Bikes: Nekobasu, Pandicorn, Lakitu

Mentioned: 119 Post(s)
Tagged: 0 Thread(s)
Quoted: 4905 Post(s)
Liked 1,731 Times in 958 Posts
I wish you nothing but good luck. Construction of a 4.5 mile stretch to extend the northern end of the Santa Ana River Trail (SART) was approved in 2008, funded (supposedly) in 2011, and we haven't seen anything yet. The 12.8 mile section in Corona is slated to begin construction sometime in 2019. Bidding for that project ended in 2010. The wheels of bureaucracy do move so very slowly.
__________________
DrIsotope is offline  
Old 07-29-18, 09:02 PM
  #3  
larryfeltonj
Senior Member
Thread Starter
 
Join Date: Jun 2007
Location: Atlanta GA
Posts: 553

Bikes: Raleigh Supercourse, Peugeot Iseran, Raleigh Twenty

Mentioned: 1 Post(s)
Tagged: 0 Thread(s)
Quoted: 3 Post(s)
Likes: 0
Liked 1 Time in 1 Post
Originally Posted by DrIsotope
I wish you nothing but good luck. Construction of a 4.5 mile stretch to extend the northern end of the Santa Ana River Trail (SART) was approved in 2008, funded (supposedly) in 2011, and we haven't seen anything yet. The 12.8 mile section in Corona is slated to begin construction sometime in 2019. Bidding for that project ended in 2010. The wheels of bureaucracy do move so very slowly.
One advantage this extension has is that it's a top priority of the Cobb County DOT, as part of its Greenways and Trails Master Plan. The Silver Comet Trail is a big economic benefit to the county. The planning, bidding, and funding will obviously take time, but I suspect it will be fast-tracked as much as possible.
larryfeltonj is offline  
Old 07-30-18, 10:26 AM
  #4  
Juan Foote
LBKA (formerly punkncat)
 
Juan Foote's Avatar
 
Join Date: Jan 2010
Location: Jawja
Posts: 4,299

Bikes: Spec Roubaix SL4, GT Traffic 1.0

Mentioned: 17 Post(s)
Tagged: 0 Thread(s)
Quoted: 2208 Post(s)
Liked 960 Times in 686 Posts
In honesty, not that I ride it any more, but at the time that I did it would have been a HUGE boon to be able to get even from the river (site of the stadium now) over to the Comet on an actual rail to trail path. What passes for the trail in that area is actually the sidewalk and is hilly beyond what I would consider an average for fun rider's ability without walking.

Last edited by Juan Foote; 07-31-18 at 01:31 PM. Reason: wrong path
Juan Foote is offline  
Old 07-31-18, 07:56 AM
  #5  
dancolestock
Silver Comet Trail user
 
Join Date: Jun 2017
Location: near Smyrna, GA
Posts: 4

Bikes: (shopping for an e-bike)

Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 1 Post(s)
Likes: 0
Liked 0 Times in 0 Posts
This is long-awaited news, 20 years! It's so frustrating, that stretch of CSX right-of-way has seen little use since 11/1998 when the Cobb section of the Silver Comet Trail first opened. In fact, the unused tracks down at the Plant Atkinson Road crossing have been paved over with 2-3 inches of asphalt for years, making train passage impossible. It's possible that the Silver Comet Trail will be extended along the right-of-way down to Atlanta Road, or perhaps all the way across the Chattahoochee River on the trestle bridge (landing right in the middle of Atlanta's infamous RM Clayton Water Reclamation Plant). Depends on the terms of the agreement with the state and how much right-of-way CSX is willing to officially abandon, fortunately they're finally in the mood to deal..
The point is for Cobb County to complete the eastern end of their segment of the SCT, connecting across the Chattahoochee River into Atlanta/Fulton County, which will leave it solely up to them to make final connection(s) with the Atlanta Beltline trail network.
This extension of the Silver Comet Trail will get trail users safely past heavy traffic on the East-West Connector Highway, South Cobb Drive, I-285 north/south and the CSX Atlanta-Chattanooga line via existing underpasses.

Last edited by dancolestock; 07-31-18 at 08:09 AM.
dancolestock is offline  
Old 07-31-18, 06:28 PM
  #6  
Spoonrobot 
Senior Member
 
Spoonrobot's Avatar
 
Join Date: Jul 2006
Posts: 3,063
Mentioned: 63 Post(s)
Tagged: 0 Thread(s)
Quoted: 1216 Post(s)
Liked 183 Times in 116 Posts
The editor's note seems to have walked back the story:

[Editor’s note: Representative Anulewicz contacted the Courier to emphasize that there is no official announcement on CSX’s Silver Comet track at this point, and that the quote from her only referred to the announcement regarding the details of the state’s lease with CSX. We will update the story as more information becomes available and provide further correction or clarification if needed — the Editor]
Spoonrobot is offline  
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
Papa Tom
Northeast
15
02-04-20 07:38 PM
coney462
Northeast
1
10-11-18 11:22 AM
daf1009
Classic & Vintage
21
11-22-14 09:37 PM
gmt13
Southeast
5
11-22-12 12:04 PM

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service -

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.