Birmingham MI: New shared use path
#1
Full Member
Thread Starter
Birmingham MI: New shared use path
BIRMINGHAM — Around the beginning of May, the city of Birmingham is set to start a non-motorized shared-use path project with Cranbrook.
On the west side of Cranbrook Road, a 10-foot-wide shared use path will be constructed from 14 Mile Road to Lincoln Street, and a 5-foot path will be constructed from Lincoln Street to the existing safety path in Bloomfield Township, just south of Middlebury Lane.
On the east side of Cranbrook Road, there will be a 10-foot-wide path from Lincoln to Midvale and a 5-foot-wide path from Northlawn Boulevard to Lincoln Street.
Full article: https://www.candgnews.com/news/share...-walkable-2283
Likes For detroitjim:
#2
Senior Member
Join Date: Jan 2010
Location: se MIch.
Posts: 2,316
Bikes: 1938 claud butler,1983 Basso,teledyne titan,teocali super,nrs,1993 stumpjumper fsr,Paramountain,Paramount Buell(sold),4 banger,Zaskar LE,Colnago Master Ibex MTB,1987ish,.etc....
Mentioned: 7 Post(s)
Tagged: 0 Thread(s)
Quoted: 805 Post(s)
Liked 2,987 Times
in
1,500 Posts
TY for info.
quite a narrow road between the golf courses with gravel shoulders.will be a great improvement especially with over sized pickups & suvs of the rich.
#3
Senior Member
Join Date: Oct 2013
Location: Mich
Posts: 7,397
Bikes: RSO E-tire dropper fixie brifter
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 6 Post(s)
Liked 2,981 Times
in
1,921 Posts
i didnt catch the proposed completion date... 2025? lol
__________________
-Oh Hey!
-Oh Hey!