Maybrook Trail
#1
Newbie
Thread Starter
Join Date: Oct 2008
Location: Ithaca, NY
Posts: 73
Bikes: Fuji Jari Carbon 1.1, Honey Winterando (made by Seven), Litespeed Arenberg
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 11 Post(s)
Likes: 0
Liked 1 Time
in
1 Post
Maybrook Trail
Anyone know the status of the Maybrook trail from Hopewell Junction to Brewster? Trying to plan a ride. Thanks.
#2
Senior Member
Join Date: Jul 2007
Location: South shore, L.I., NY
Posts: 6,857
Bikes: Flyxii FR322, Cannondale Topstone, Miyata City Liner, Specialized Chisel, Specialized Epic Evo
Mentioned: 18 Post(s)
Tagged: 0 Thread(s)
Quoted: 3221 Post(s)
Liked 2,046 Times
in
1,170 Posts
https://maybrooktrailway.org/
Scheduled to open sometime in 2021. The site indicates they will issue fines for trespassing, but I suspect you'd have to be lucky to see an MTA cop, they are usually asleep in a train station parking lot somewhere.
Finn reported this back in July:
"Maybrook trailway is ready to ride. It is not officially open, there are signs and orange cones and such at crossings telling that the path is not yet open but they are generally ignored. There's about a 1 mile section in Brewster that is not complete but its an easy go around. About 23 miles. Flat and fast. Have ridden it a couple weeks in a row now and the progress has been tremendous in the last couple months. This is a great connector, now you can go from NYC to New Paltz and beyond on a paved path with very little time on the road. Enjoy"
https://www.bikeforums.net/northeast...danbury-2.html
Scheduled to open sometime in 2021. The site indicates they will issue fines for trespassing, but I suspect you'd have to be lucky to see an MTA cop, they are usually asleep in a train station parking lot somewhere.
Finn reported this back in July:
"Maybrook trailway is ready to ride. It is not officially open, there are signs and orange cones and such at crossings telling that the path is not yet open but they are generally ignored. There's about a 1 mile section in Brewster that is not complete but its an easy go around. About 23 miles. Flat and fast. Have ridden it a couple weeks in a row now and the progress has been tremendous in the last couple months. This is a great connector, now you can go from NYC to New Paltz and beyond on a paved path with very little time on the road. Enjoy"
https://www.bikeforums.net/northeast...danbury-2.html
#3
Junior Member
Thanks for keeping this topic alive and for the links.
One obvious irony missed in the debate and decision about the project name change https://maybrooktrailway.org/resources/ is that while this trail was never intended to continue along the right-of-way to Beacon, it'll never connect to Maybrook, either.
I'm looking forward to riding it whatever it's named.
One obvious irony missed in the debate and decision about the project name change https://maybrooktrailway.org/resources/ is that while this trail was never intended to continue along the right-of-way to Beacon, it'll never connect to Maybrook, either.
I'm looking forward to riding it whatever it's named.
#4
Newbie
Join Date: Oct 2020
Posts: 1
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 0 Post(s)
Likes: 0
Liked 0 Times
in
0 Posts
the entire stretch from pumphouse rd* in brewster to hopewell junction is done and absolutely beautiful.
there are signs indicating you are not yet allowed to go on it, but no real barriers.
*they're still paving a little part just south of that, though most of that stretch to peaceable hill rd (which right now seems to be the southern start point) is also done.
there are signs indicating you are not yet allowed to go on it, but no real barriers.
*they're still paving a little part just south of that, though most of that stretch to peaceable hill rd (which right now seems to be the southern start point) is also done.
#5
Senior Member
Join Date: May 2017
Location: Northampton, MA
Posts: 1,909
Bikes: 36" Unicycle, winter knock-around hybrid bike
Mentioned: 15 Post(s)
Tagged: 0 Thread(s)
Quoted: 930 Post(s)
Liked 393 Times
in
282 Posts
According the governor's press release, the Maybrook and (all other new pieces of the Empire State Trail) opens today
https://www.governor.ny.gov/news/gov...re-state-trail
That said, not sure what the situation on the ground actually is - they had been threatening to ticket people who used it before formal opening.
https://www.governor.ny.gov/news/gov...re-state-trail
That said, not sure what the situation on the ground actually is - they had been threatening to ticket people who used it before formal opening.
#6
Member
Join Date: Aug 2015
Posts: 26
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 8 Post(s)
Likes: 0
Liked 3 Times
in
2 Posts
Maybrook is open north from Pumphouse Rd and Lake Tonetta in Brewster. The "stay off" signage and barriers at that access point, and at Southeast Town Park, are gone and the trail is actively being used already. There's a new parking area just above the town park parking lot specifically for the trail too. Nice. It appears very possible that there may be even more parking in the works from the construction still in progress.
South of Pumphouse to the north side of Brewster village is now paved too, which wasn't the case a few months ago. That section has "use prohibited" signs still at Pumphouse but oddly no other access point that we saw. Imagine it won't be long till that's officially open as well.
We walked a short part of it today while in the area. Looking forward to cycling it!
South of Pumphouse to the north side of Brewster village is now paved too, which wasn't the case a few months ago. That section has "use prohibited" signs still at Pumphouse but oddly no other access point that we saw. Imagine it won't be long till that's officially open as well.
We walked a short part of it today while in the area. Looking forward to cycling it!