Maybrook Trail

Anyone know the status of the Maybrook trail from Hopewell Junction to Brewster? Trying to plan a ride. Thanks.
jbithaca is offline  
Old 09-28-20, 11:11 AM
  #2  
Steve B.
Senior Member
 
Join Date: Jul 2007
Location: South shore, L.I., NY
Posts: 6,857

Bikes: Flyxii FR322, Cannondale Topstone, Miyata City Liner, Specialized Chisel, Specialized Epic Evo

Mentioned: 18 Post(s)
Tagged: 0 Thread(s)
Quoted: 3221 Post(s)
Liked 2,046 Times in 1,170 Posts
https://maybrooktrailway.org/

Scheduled to open sometime in 2021. The site indicates they will issue fines for trespassing, but I suspect you'd have to be lucky to see an MTA cop, they are usually asleep in a train station parking lot somewhere.

Finn reported this back in July:
"Maybrook trailway is ready to ride. It is not officially open, there are signs and orange cones and such at crossings telling that the path is not yet open but they are generally ignored. There's about a 1 mile section in Brewster that is not complete but its an easy go around. About 23 miles. Flat and fast. Have ridden it a couple weeks in a row now and the progress has been tremendous in the last couple months. This is a great connector, now you can go from NYC to New Paltz and beyond on a paved path with very little time on the road. Enjoy"

https://www.bikeforums.net/northeast...danbury-2.html
Steve B. is offline  
Old 09-29-20, 06:25 PM
  #3  
arbee
Junior Member
 
arbee's Avatar
 
Join Date: Apr 2014
Location: New York City
Posts: 146
Mentioned: 6 Post(s)
Tagged: 0 Thread(s)
Quoted: 60 Post(s)
Liked 27 Times in 17 Posts
Thanks for keeping this topic alive and for the links.

One obvious irony missed in the debate and decision about the project name change https://maybrooktrailway.org/resources/ is that while this trail was never intended to continue along the right-of-way to Beacon, it'll never connect to Maybrook, either.

I'm looking forward to riding it whatever it's named.
arbee is offline  
Old 10-15-20, 07:24 PM
  #4  
bkbikelife
Newbie
 
Join Date: Oct 2020
Posts: 1
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 0 Post(s)
Likes: 0
Liked 0 Times in 0 Posts
the entire stretch from pumphouse rd* in brewster to hopewell junction is done and absolutely beautiful.
there are signs indicating you are not yet allowed to go on it, but no real barriers.

*they're still paving a little part just south of that, though most of that stretch to peaceable hill rd (which right now seems to be the southern start point) is also done.
bkbikelife is offline  
Old 12-30-20, 11:45 PM
  #5  
UniChris
Senior Member
 
UniChris's Avatar
 
Join Date: May 2017
Location: Northampton, MA
Posts: 1,909

Bikes: 36" Unicycle, winter knock-around hybrid bike

Mentioned: 15 Post(s)
Tagged: 0 Thread(s)
Quoted: 930 Post(s)
Liked 393 Times in 282 Posts
According the governor's press release, the Maybrook and (all other new pieces of the Empire State Trail) opens today

https://www.governor.ny.gov/news/gov...re-state-trail

That said, not sure what the situation on the ground actually is - they had been threatening to ticket people who used it before formal opening.
UniChris is offline  
Old 01-02-21, 03:02 PM
  #6  
TravellingFool
Member
 
Join Date: Aug 2015
Posts: 26
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 8 Post(s)
Likes: 0
Liked 3 Times in 2 Posts
Maybrook is open north from Pumphouse Rd and Lake Tonetta in Brewster. The "stay off" signage and barriers at that access point, and at Southeast Town Park, are gone and the trail is actively being used already. There's a new parking area just above the town park parking lot specifically for the trail too. Nice. It appears very possible that there may be even more parking in the works from the construction still in progress.

South of Pumphouse to the north side of Brewster village is now paved too, which wasn't the case a few months ago. That section has "use prohibited" signs still at Pumphouse but oddly no other access point that we saw. Imagine it won't be long till that's officially open as well.

We walked a short part of it today while in the area. Looking forward to cycling it!
TravellingFool is offline  
Likes For TravellingFool:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


Thread Tools
Search this Thread

Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service -

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.