New Detroit Riverfront Plans
#1
Still learning
Thread Starter
New Detroit Riverfront Plans
Includes traffic calming, bike lanes and more.
https://www.detroitnews.com/story/news/local/detroit-city/2017/03/01/riverfront-facelift-proposed-east-side-detroit/98608834/
https://www.detroitnews.com/story/news/local/detroit-city/2017/03/01/riverfront-facelift-proposed-east-side-detroit/98608834/
#2
Senior Member
Join Date: Jul 2010
Location: Michigan
Posts: 4,863
Bikes: too many of all kinds
Mentioned: 35 Post(s)
Tagged: 0 Thread(s)
Quoted: 1147 Post(s)
Liked 415 Times
in
335 Posts
Nice. No real mention of connecting that last couple hundred vacant yards between Mt. Elliot part and the Belle Isle Bridge...
#3
Senior Member
Join Date: Jan 2016
Location: 961' 42.28° N, 83.78° W (A2)
Posts: 2,344
Bikes: Mongoose Selous, Trek DS
Mentioned: 8 Post(s)
Tagged: 0 Thread(s)
Quoted: 941 Post(s)
Liked 319 Times
in
189 Posts
Glad to see this. I worked in downtown "D" for many years before my job took me out to New Hudson. While down town I envied the Windsor waterfront, lots of green whereas the Detroit side was pretty crappy.
#4
Full Member
The TV news has just shown an interview with the Riverfront Conservancy. In fact, a connection will be made along the river at the old US Rubber property from Mt Elliot to Gabriel Richard park. From what I've seen reports construction won't start until this fall. There wasn't any estimates on the projects completion. My guess is it may be open for the summer of 2019(just because of the way things work out).
It puzzles me as to why they wouldn't begin work within the next two months. Better weather more progress.
It puzzles me as to why they wouldn't begin work within the next two months. Better weather more progress.
Last edited by detroitjim; 03-02-17 at 05:06 PM.