Frame is now ready for the build. In checking the frame before the final polish, I found that it needed to be cold set back to 120 from 126 and the hangar needed to be aligned. Pretty happy with how it came out. I’m no Jack Trumbull but this came out pretty sharp for a rattle can job. Good prep and a lot of sanding makes all the difference.