View Single Post
Old 02-05-23, 11:30 AM
  #18  
Telkwa
Junior Member
 
Join Date: Jun 2008
Posts: 176
Mentioned: 1 Post(s)
Tagged: 0 Thread(s)
Quoted: 30 Post(s)
Liked 4 Times in 4 Posts
Yeah, foofer, I shoulda done the taping inside the warm house. The shop was about 40 degrees. One more thing on the long list of steps to a successful (or not) t/l installation.
Telkwa is offline