View Single Post
Old 04-24-22, 09:22 AM
  #109  
poprad
Senior Member
 
poprad's Avatar
 
Join Date: Jun 2005
Location: In transit
Posts: 1,897

Bikes: 07 Vanilla, 98 IRD road frame built up with 25th Ann DA, Surly cross check with 105 comp, 78 Raleigh Comp GS, 85 Centurionelli

Mentioned: 8 Post(s)
Tagged: 0 Thread(s)
Quoted: 87 Post(s)
Liked 923 Times in 191 Posts
OK, finally, Doug F this is all for you. When I asked Olivier was happy to share. I had noted that the frame table was clear so it was the perfect day to lower the jig and get some pics. The short video is Olivier explaining his layup process.


Lowered by means of steel cables. It's not light, and I wouldn't want to be in the way if one of them failed!







poprad is offline