Old 08-15-21, 07:40 PM
  #40  
ghcoe
Member
 
Join Date: Jan 2021
Posts: 43
Mentioned: 1 Post(s)
Tagged: 0 Thread(s)
Quoted: 9 Post(s)
Liked 7 Times in 7 Posts
After the walls were dry it was time to raise the roof...

I applied some 1"x2" to hold the roof in place as I installed it and as the glue dried.



Usually I set the roof on top of the walls, but I on this build I decided to install between the walls. This will help hold the curve of the walls at the top since the foam does want to go straight.





ghcoe is offline