View Single Post
Old 06-01-19, 01:57 PM
  #8162  
rholland1951
Senior Member
 
rholland1951's Avatar
 
Join Date: May 2011
Posts: 3,175
Mentioned: 15 Post(s)
Tagged: 0 Thread(s)
Quoted: 534 Post(s)
Liked 1,741 Times in 890 Posts
This is the Weston segment of the Mass Central Rail Tail, a LONG trail to be built on the abandoned road bed of the old Mass Central Railroad, which was knocked out by the 1938 hurricane and never restored to service. A previous effort was known as the Wayside Rail Trail.

By way of reference, here's a link to a 2014 posting detailing my previous encounter with this trail, in its unimproved state. There's a little blood after the first jump.


A bit of gloomy history dealing with Weston scuttling its segment of the proposed Wayside Rail Trail can be found here.

A cheerful (but vague) newspaper article about the forthcoming grand opening can be found here.

A FAQ about the trail from the Town of Weston can be found here.

After Weston rejected the original Wayside Trail in 1997, they built a physical barrier at Conant Street to discourage informal use. That's being (or has been) removed. Plus ça change...

Time to go ride it.

rod

Last edited by rholland1951; 06-01-19 at 02:04 PM.
rholland1951 is offline