View Single Post
Old 04-20-22, 06:24 PM
  #98  
zukahn1 
Senior Member
 
zukahn1's Avatar
 
Join Date: Oct 2011
Location: Fairplay Co
Posts: 9,518

Bikes: Current 79 Nishiki Custum Sport, Jeunet 620, notable previous bikes P.K. Ripper loop tail, Kawahara Laser Lite, Paramount Track full chrome, Raliegh Internatioanl, Motobecan Super Mirage. 59 Crown royak 3 speed

Mentioned: 26 Post(s)
Tagged: 1 Thread(s)
Quoted: 790 Post(s)
Liked 1,761 Times in 634 Posts
Well got some work done on the Stone Grinder turns out most of the drive train and brake levers were a no go got it pieced together with some additional parts and rolling for a short ride. So i'm in $50 for the start pile and about $25 additional junk parts bars stem brake levers and swag crank arms and negative value freewheel place holder. So about 5 miles in on the challenge and have $30 or so budget to get things sorted out and another 95 miles to go.


It looks like to get this one running good and complete the challenge in budget I may have to go with ugh single grip shifter for a strait 7speed rear.

Last edited by zukahn1; 04-20-22 at 06:30 PM.
zukahn1 is offline