View Single Post
Old 11-29-22, 05:17 PM
  #10360  
bike_tom
Full Member
 
bike_tom's Avatar
 
Join Date: Feb 2018
Location: Arlington, MA
Posts: 290

Bikes: 2022 Trek Checkpoint ALR5, 2014 Cannondale Trail SL1, 1983 Fuji Royale II

Mentioned: 2 Post(s)
Tagged: 0 Thread(s)
Quoted: 144 Post(s)
Liked 585 Times in 240 Posts
I just noticed that the BFRT Fall Newsletter has been posted. Thought this might be of interest to folks who follow our Metro Boston thread: https://brucefreemanrailtrail.org/wp...-Fall-2022.pdf


The headline story is of particular note: Sudbury has awarded the construction contract to extend the BFRT from the current southern terminus in Concord to (what would become) the MCRT junction. That's about 5 more miles of trail. It seems Sudbury residents have a different take on rail trails than those of Bedford...


Here is picture of the rights-of-way that would become the BFRT - MCRT junction:





(photo credit to Belmont Citizens Forum: https://www.belmontcitizensforum.org...eyond-belmont/)

I dream of the MM connecting to the BFRT and that to the MCRT, and the MCRT being completed eastward to the existing Fitchburg Cutoff and the MM at Alewife. It's not too bad getting from the MM (or rather, the Reformatory Trail at Lowell Rd) to the BFRT via streets, so even without the MM extension, a mostly rail trail version of that loop could exist someday.

Tom

Last edited by bike_tom; 11-29-22 at 05:28 PM.
bike_tom is offline  
Likes For bike_tom: