Toe’d in.
With a 106-miler in 2 days, I toe’d in the new pads using a third hand tool and 3 slivers of card stock. I think they are ready. The 11-36 cassette is ready, Di2 shifting smoothly with the Roadlink and the B-screw in half way. The +1 is ready to ride.
After a terrifying drive over Loveland Pass, I’m skipping the ride. Good thing, because her Edge 1000 failed as well as her Varia headlight. She’ll be using mine.
Appreciate the toe-in advice.