Old 01-27-22, 09:32 PM
  #49  
bigwies
Mega Clyde
 
bigwies's Avatar
 
Join Date: Aug 2007
Location: Melrose, MA
Posts: 267

Bikes: 2011 Surly Long Haul Trucker, 2007 Trek 7100

Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 13 Post(s)
Liked 9 Times in 5 Posts
So the build has begun. New stem and bars installed. Bar end shifters moved over to the new bars. I still need to pick up some new brake levers, brake cables, housing and the Ergon GC1 grips. The new VO stem is 120mm/6 degree rise.

I am hoping to get the rest of the parts I need tomorrow as we are forecast for 18 to 24 inches of snow starting early AM on Saturday. That will make for a good weekend project. The big issue will be getting back out on the road after a big storm.


bigwies is offline  
Likes For bigwies: