When they announced a connection between the White Rock Creek Trail and the Northaven Trail with new bridges over White Rock Creek and North Central Expressway US 75, I looked at the decade+ long time line of the bridge over Mockingbird and thought 'Grand opening will be in 2034.'

Dye me green and call me Kermit! Construction is moving along. If you've driven Central (I'm sorry) you've seen the construction at Northaven Drive for the 'signature' bridge over the freeway. The bridge over White Rock Creek is coming along, too.