View Single Post
Old 08-02-19, 05:56 PM
  #8281  
bike_tom
Full Member
 
bike_tom's Avatar
 
Join Date: Feb 2018
Location: Arlington, MA
Posts: 290

Bikes: 2022 Trek Checkpoint ALR5, 2014 Cannondale Trail SL1, 1983 Fuji Royale II

Mentioned: 2 Post(s)
Tagged: 0 Thread(s)
Quoted: 144 Post(s)
Liked 585 Times in 240 Posts
Was off today so had a chance to take an early ride out to Concord on the MM and the Reformatory Trail. Before noon the weather was fabulous for riding.
Overall it was pretty quiet, though I had a nice chat with some folks at the Bedford Depot.

Some things to report along these familiar trails.
Foundation work is under way at the new Lexington Visitor center:



Noticed that fresh gravel has been placed over several low wet spots on the Reformatory, in the area east of Hartwell Road:




Biggest news was the improvement at the Bedford/Concord line, at the eastern edge of the Great Meadows. That tricky spot with the pit and exposed drainage pipe has been cleaned up considerably:



And somebody finally mowed the tall grass at the clearing on Lowell Rd, across from Trails End:




As has already been reported by others, Lexington is going to start repaving the MM between the Arlington line and Season's four next week. Expect detours onto Mass Ave on weekdays starting this Monday.
bike_tom is offline  
Likes For bike_tom: