WB&A Trail Pax River Bridge Crossing to Join PG & AA Co Trail Sections
#26
Senior Member
Join Date: Apr 2011
Location: Maryland, USA
Posts: 2,442
Bikes: Drysdale/Gitane/Zeus/Masi/Falcon/Palo Alto/Raleigh/Legnano
Mentioned: 34 Post(s)
Tagged: 0 Thread(s)
Quoted: 987 Post(s)
Liked 641 Times
in
407 Posts
I presume this means you've gone and examined the site(s)? Not good news and further delays might mean no use of a new bridge in 2024 either...
__________________
Larry:1958 Drysdale, 1961 Gitane Gran Sport, 1974 Zeus track, 1988 Masi Gran Corsa, 1974 Falcon, 1980 Palo Alto, 1973 Raleigh Gran Sport, 1974 Legnano. Susan: 1976 Windsor Profesional.
Larry:1958 Drysdale, 1961 Gitane Gran Sport, 1974 Zeus track, 1988 Masi Gran Corsa, 1974 Falcon, 1980 Palo Alto, 1973 Raleigh Gran Sport, 1974 Legnano. Susan: 1976 Windsor Profesional.
#28
Senior Member
Join Date: Jan 2010
Posts: 39,257
Mentioned: 211 Post(s)
Tagged: 1 Thread(s)
Quoted: 18424 Post(s)
Liked 15,582 Times
in
7,337 Posts
Call your government officials.
#29
Senior Member
Join Date: Apr 2011
Location: Maryland, USA
Posts: 2,442
Bikes: Drysdale/Gitane/Zeus/Masi/Falcon/Palo Alto/Raleigh/Legnano
Mentioned: 34 Post(s)
Tagged: 0 Thread(s)
Quoted: 987 Post(s)
Liked 641 Times
in
407 Posts
... and get ignored. Last time I tried, Anne Arundel County contact said "anything we have to say will be on our website", and Prince George's County did not answer at all.
__________________
Larry:1958 Drysdale, 1961 Gitane Gran Sport, 1974 Zeus track, 1988 Masi Gran Corsa, 1974 Falcon, 1980 Palo Alto, 1973 Raleigh Gran Sport, 1974 Legnano. Susan: 1976 Windsor Profesional.
Larry:1958 Drysdale, 1961 Gitane Gran Sport, 1974 Zeus track, 1988 Masi Gran Corsa, 1974 Falcon, 1980 Palo Alto, 1973 Raleigh Gran Sport, 1974 Legnano. Susan: 1976 Windsor Profesional.
#30
Newbie
Thread Starter
The county is going to move at the pace that they can as their time and budget allows. I think individuals contacting the county (either county) will have about zero effect in moving this project along. If an organization, or a couple organizations can come together and apply pressure that may nudge the project along. Think Washington Bicycle League, Potomac Pedalers, etc. I was a board member of MORE MTB club 20-ish years ago and the club had good/established relationships w/ several county govts in the DC area and we could get things nudged along as we had the numbers (members), and had an established relationship w/ various counties in the region.
YMMV
YMMV
#31
Newbie
Join Date: Jul 2023
Posts: 1
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 0 Post(s)
Likes: 0
Liked 0 Times
in
0 Posts
It’s still slated to be completed spring of 2024.
The current status on AAcounty.org says: “Material clearance and regulatory reviews of replacement manufactured components are in process. Once complete, bridge assembly, erection and launch to be initiated.”
So, things are happening just not at the site for the moment.
The current status on AAcounty.org says: “Material clearance and regulatory reviews of replacement manufactured components are in process. Once complete, bridge assembly, erection and launch to be initiated.”
So, things are happening just not at the site for the moment.
#33
Newbie
Join Date: Mar 2024
Posts: 1
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 1 Post(s)
Likes: 0
Liked 0 Times
in
0 Posts
Sorry just created this account to update everyone so I can't direct link but if you search youtube for 'WB&A Trail Bridge Project Status 21 March 2024' under channel Spokes-n-Sprockets. They have some drone footage and there appears to be some recent activity at the site and initial assembly of the bridge that I have not seen before.
#34
Senior Member
Join Date: Apr 2011
Location: Maryland, USA
Posts: 2,442
Bikes: Drysdale/Gitane/Zeus/Masi/Falcon/Palo Alto/Raleigh/Legnano
Mentioned: 34 Post(s)
Tagged: 0 Thread(s)
Quoted: 987 Post(s)
Liked 641 Times
in
407 Posts
Sorry just created this account to update everyone so I can't direct link but if you search youtube for 'WB&A Trail Bridge Project Status 21 March 2024' under channel Spokes-n-Sprockets. They have some drone footage and there appears to be some recent activity at the site and initial assembly of the bridge that I have not seen before.
__________________
Larry:1958 Drysdale, 1961 Gitane Gran Sport, 1974 Zeus track, 1988 Masi Gran Corsa, 1974 Falcon, 1980 Palo Alto, 1973 Raleigh Gran Sport, 1974 Legnano. Susan: 1976 Windsor Profesional.
Larry:1958 Drysdale, 1961 Gitane Gran Sport, 1974 Zeus track, 1988 Masi Gran Corsa, 1974 Falcon, 1980 Palo Alto, 1973 Raleigh Gran Sport, 1974 Legnano. Susan: 1976 Windsor Profesional.
#35
Newbie
Thread Starter
Looks like there was progress made between the two videos made 10 days apart. One posted on 3/21/2024 and the other on 3/31/2024. Looks like length of the partially assembled bridge increased during that 10 day period. And a construction/office trailer placed at the site.