Old 04-13-22, 03:35 PM
  #1  
force10
Full Member
 
Join Date: Feb 2014
Location: Lehigh Valley
Posts: 248
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quoted: 123 Post(s)
Liked 54 Times in 44 Posts
LBS building up a new bike for sale - what is involved

I'm curious how much they have to do and/or how much time is involved in preparing something like a mid-tier gravel or road bike from one of the larger manufacturers.

Is it running cables and assembling BB's, headsets, groupset, putting fluid in the brakes etc? Or just air (+sealant) in the tires and handlebar to the stem? Or something in between?
force10 is offline